Lettable standard
Lettable standard - post-void work
The table below shows the actions now undertaken once the new tenant has moved in.
Element | Task |
Windows | Replace any failed double-glazed units. |
Doors - Internal | Renew if damaged beyond repair, considering the 50% rule. |
Doors External | Carry out necessary repairs to doors including decoration where required. |
Kitchens | Ensure cooker space has 600mm stainless steel splashback |
Bathroom | 2 or 3 apartment ground floor properties to be changed to wet rooms at planned upgrade through capital programme. |
Upgrades | Arrange mutually convenient date to undertake necessary upgrades. |
Decoration | Minor decoration, issue a decoration voucher for sign up. |
Attic space | Top up insulation if less than 300mm. |
Attic space | Install walkway to tanks where required. |
Attic space | If condensation is evident fit additional ventilation. |
Garden | Cut back overgrown weeds, grass, hedges and leave in a manageable state for new tenant. |
Misc | Remove redundant coal bunkers. |
Sheds and outbuildings | Remove any with health and safety concerns. |
Sheds and outbuildings | Inspect condition of shed or other ancillary building, repair, paint or replace as required, ensure those with locks are fully operational. |
Fences and gates | Boundary fences and gates to be safe and secure. |